We are pleased to share that three of our bridge engineers had the opportunity to participate in this exciting event over the past few days.
The training sessions covered key topics such as bridge inspections, load capacity assessments, and the use of CAD and BIM tools like Tekla, Revit, and Civil 3D. Participants also worked on developing best practices for creating technical drawings.
The event, led by experts from Tyréns, brought together an international team of engineers from Poland, Lithuania, and Sweden. The workshops took place at Tyréns’ office and in the conference rooms of the Örebro City Theatre.
A highlight of the event was a study visit, along with team-building activities, including a tour of a municipal nature reserve created on a reclaimed landfill by the lake.
Our engineers explored the city, including visits to the medieval royal castle and the former prison.